Video
The video for this chapter is not available yet.
Exam domains and objectives covered
Domain 6: Security Assessment and Testing Main domain
- 6.3 Collect security process data (e.g., technical and administrative)
Domain 7: Security Operations
- 7.10 Implement recovery strategies
- 7.11 Implement disaster recovery (DR) processes
- 7.12 Test disaster recovery plans (DRP)
Objectives are numbered as in the official ISC2® CISSP exam outline.
Learning objectives
By the end of this chapter you should be able to:
- Explain how disaster recovery complements business continuity planning
- Identify natural and human-made disasters, including utility, infrastructure and supply failures
- Build resilience with redundancy, RAID, clustering, power protection, trusted recovery and QoS
- Compare cold, warm, hot, mobile, cloud and multiple-site recovery options and mutual assistance agreements
- Choose backup types, storage locations and database recovery techniques that meet the RPO and RTO
- Run the DR process: response, personnel, communications, assessment, restoration, training and lessons learned
- Select the right DR plan test, understand its impact and communicate it to stakeholders and regulators
Key topics
- BCP versus DRP
- Natural and human-made disasters
- Single points of failure
- High availability and fault tolerance
- RAID levels
- Trusted recovery
- Quality of service
- Cold, warm and hot sites
- Mutual assistance agreements
- Electronic vaulting, remote journaling, remote mirroring
- Full, incremental and differential backups
- Software escrow
- Recovery versus restoration
- DR plan tests
Chapter notes
Chapter overview
Business continuity (Chapter 3) decides what must keep running. Disaster recovery (DR) provides the technical means to restore it: resilient systems, backups, alternate sites and a rehearsed plan for switching over and coming back. In practice many organisations run both under one business continuity management (BCM) programme that also covers crisis management. A good DR plan is written so that it can almost run itself, with as few decisions as possible left to people under stress.
Key concepts
What can go wrong
A disaster is any event that stops, or threatens to stop, the organisation doing its work.
- Natural: earthquakes (most likely near fault lines, but possible almost anywhere), floods (gradual, flash, dam failure, tsunami), storms (wind, hail, lightning), wildfires, pandemics (which close workplaces without damaging them) and regional hazards such as volcanoes, monsoons, avalanches and landslides.
- Human-made: fires from faults, carelessness or arson; terrorism and explosions; power cuts; failures of other utilities (water, gas, sewerage) and transport; loss of network connectivity; hardware and software failures; strikes and other labour action; and theft and vandalism, including scrap thieves stripping copper from infrastructure.
Practical planning points:
- Use public hazard data (flood and seismic maps, weather and fire services) in the risk assessment, and involve local emergency experts for each site.
- Check insurance. Standard business policies often exclude floods or terrorism; actual cash value cover pays depreciated value, so you need replacement cost cover to rebuild; valuable papers cover protects business records; cyber policies cover security breaches.
- Look for hidden single points of failure: two internet providers whose cables share one conduit, a water-based fire system with no stored supply, a spare part that only ships from overseas.
- Keep spares of critical and easily stolen components, and stay realistic about terrorism versus more likely threats.
Resilience and high availability
| Term | Meaning |
|---|---|
| Single point of failure (SPOF) | Any component whose failure brings down the whole system |
| Fault tolerance | Keeps working despite a component failure, through redundant parts (RAID, clusters) |
| High availability (HA) | Recovers quickly after a brief interruption, typically through failover and load balancing |
| System resilience | Maintains acceptable service during an adverse event and can return to normal afterwards (for example, failing back) |
Availability targets are expressed as “nines”. Over a 30-day month, 99.9% allows roughly 43 minutes of downtime and 99.999% only about 26 seconds. Each extra nine costs considerably more.
RAID protects disks:
| Level | Technique | Minimum disks | Survives |
|---|---|---|---|
| RAID 0 | Striping | 2 | No failures (performance only) |
| RAID 1 | Mirroring | 2 | One disk |
| RAID 5 | Striping with distributed parity | 3 | One disk (slower while degraded) |
| RAID 6 | Striping with double parity | 4 | Two disks |
| RAID 10 | A stripe of mirrors | 4 | One disk per mirror pair |
Hardware RAID is faster and more reliable than software RAID and often supports hot spares and hot swapping. Remember that RAID is not a backup: it won’t help when a file is deleted, data is corrupted or the whole array is destroyed.
For servers, failover clusters move work to a standby node automatically, and load balancers spread traffic and stop sending it to failed nodes. Some services, such as directory domain controllers and replicated databases, have redundancy built in. In the cloud, spread workloads across availability zones and regions and use the provider’s health checks and auto-scaling.
For power, a UPS bridges minutes, long enough for a clean shutdown or for a generator to start; generators run as long as fuel lasts. Pre-arrange fuel deliveries, because a regional disaster creates shortages. Test UPS units and watch for overloading.
Trusted recovery means a system comes back from a failure no less secure than before. Decide in advance whether it should fail secure (block access) or fail open (allow access). Recovery should start in a restricted, single-user mode, restore damaged files and services, and check security labels and settings before users return. The Common Criteria describes four levels: manual recovery, automated recovery (for at least one type of failure), automated recovery without undue loss (also protecting data and objects) and function recovery (each function either completes or rolls back to a secure state).
Quality of service (QoS) protects network availability under load by managing bandwidth, latency, jitter (variation in latency), packet loss and interference, and by prioritising business-critical, delay-sensitive traffic such as voice and video.
Recovery strategy
- Use the business impact analysis to rank business units and processes by priority, with their agreed recovery targets: how much data may be lost (RPO), how quickly each must be back (RTO), and the absolute limit before serious harm (MTD). Restoring part of a top unit and then minimum capacity elsewhere can beat restoring one unit fully.
- Crisis management: train the people most likely to spot an emergency (guards, technical staff) so panic doesn’t override basics such as raising the alarm.
- Emergency communications: have alternative channels ready, keep staff informed about where to report, keep the public informed so they don’t assume the worst, and route all media questions to public relations.
- Workgroup recovery: the goal is people working again, not just servers running. Separate workgroups may recover at different facilities.
Alternate processing sites
| Site | What’s there | Activation | Cost |
|---|---|---|---|
| Cold | Space, power and environmental controls; no equipment or live links | Weeks; hard to test realistically | Lowest |
| Warm | Equipment and communications ready; data restored from backup on activation | Typically 12 hours or more | Medium |
| Hot | Fully configured systems with data replicated periodically or continuously | Minutes to a few hours | Highest; roughly duplicates the IT budget |
| Mobile | Self-contained trailers or modular units, usually cold or warm | Depends on transport and set-up | Varies |
| Cloud | Ready-to-run images and replicated data with an IaaS provider | Fast, if designed and tested | Pay mostly when used |
- A hot site holds copies of production data, so protect it to the same standard as the primary site. Running development or test work there offsets the cost.
- Shared hot or warm sites are cheaper but may be oversubscribed in a regional disaster. Insist on a no-lockout clause and inspect the provider.
- A resource capacity agreement guarantees a cloud provider will supply the capacity needed for DR. Organisations already running in the cloud still need DR: use redundancy and geographic dispersion.
- Multiple processing sites spread operations across geographically separate locations so no single disaster stops everything.
- Mutual assistance (reciprocal) agreements look cheap but are hard to enforce, partners close enough to help may suffer the same disaster, and sharing facilities raises confidentiality concerns. They work best between units of the same organisation.
- For replacement hardware, owning a stockpile at another location is more reliable than relying on a vendor’s delivery promise.
Database recovery
| Technique | How it works | Data loss on failover |
|---|---|---|
| Electronic vaulting | Bulk transfer of whole backups to a remote vault; restored when needed | Everything since the last transfer; slowest to bring online |
| Remote journaling | Transaction logs shipped frequently (often hourly) and applied at recovery | Little; logs must be replayed |
| Remote mirroring | A live remote server applies every transaction as it happens | Minimal; immediate takeover, highest cost |
Choose the option that matches the RPO: weaker loses too much data, stronger wastes money. Get vaulting services defined in writing (capacity, bandwidth, retrieval time) and test them with surprise restores.
Backups and storage
- Full: copies everything and clears the archive bit.
- Incremental: copies changes since the last full or incremental backup and clears the archive bit. Fastest to create; restore needs the full backup plus every incremental since, in order.
- Differential: copies changes since the last full backup and leaves the archive bit set. Slower to create as the week goes on; restore needs only the full backup plus the latest differential.
Keep copies onsite for quick restores and offsite for survival, often in geographically redundant cloud storage, minding data residency rules across jurisdictions. Disk-to-disk backup (sometimes presented to software as a virtual tape library) still needs an offsite copy. Schedule backups off-peak, plan for data growth, back up only what recovery objectives require, use a rotation scheme such as grandfather–father–son or Tower of Hanoi, and above all test restores, because a “successful” job report proves little. Periodic backups always risk losing data since the last run; continuous protection (mirroring, clustering, replication) closes that gap.
Software escrow protects you if a small or bespoke software supplier fails: an independent third party holds the source code and releases it on agreed trigger events, such as the supplier going out of business.
The DR process
The outline’s DR process elements are response, personnel, communications, assessment, restoration, training and awareness and lessons learned.
- Plan documents suit their audience: an executive summary, department plans, technical guides for IT, checklists for team members and full copies for key leaders. Treat the plan as sensitive and share it on a need-to-know basis, but never let it live in one person’s head. Keep current printed copies at primary and alternate sites in case the intranet is down.
- Emergency response checklists put the most important tasks first, because responders may not finish them. They state the criteria for invoking the plan and who may declare a disaster.
- Personnel and communications: contact lists with alternative numbers and backups for every role.
- Assessment starts as quick triage and becomes more detailed as the response continues.
- Utilities and logistics: contacts for utility providers, and food, water, shelter and transport if staff must work away from home for some time.
- Recovery vs restoration: the recovery team gets critical processes running at the alternate site within the MTD; the salvage team later restores the primary site (or a new one). Move the least critical work back first to prove the rebuilt site, and don’t end the emergency until normal operations are fully back.
- Training: orientation for new starters, initial training for new DR role holders, detailed refreshers for the team and brief awareness for everyone else. Put DR duties in job descriptions.
- Lessons learned: hold the session soon, led by a neutral facilitator who wasn’t involved, and produce a report with improvement actions.
- Maintenance: tie the plan to change management so infrastructure changes update it.
Testing the plan
| Test | What happens | Impact on operations |
|---|---|---|
| Read-through | Team members review the plan individually and flag outdated details | None |
| Tabletop | The team discusses a scenario, revealed by a moderator, around a table | None |
| Walkthrough | The team steps through procedures together, sometimes acting some of them out | None or minimal |
| Simulation | The team rehearses a scenario and tests some response measures | May interrupt non-critical work |
| Parallel | Staff activate and run the recovery site while the primary site carries on | None to primary operations |
| Full interruption | The primary site shuts down and operations move to the recovery site | Major; highest risk and realism |
Test communications: before a test, tell stakeholders the timing, likely impact and goals; during it, give status updates (especially for disruptive tests); afterwards, debrief. Keep regulators informed and records available where rules govern DR testing. Results become security process data for Domain 6.
Exam tips
- Hot sites recover fastest and cost most; cold sites are the opposite.
- Full interruption tests carry the most risk and need senior management approval.
- Remote mirroring gives the best recovery point; electronic vaulting transfers least often.
- When returning to the primary site, move the least critical functions first.
- An untested DR plan should be treated as unreliable.
- Life safety comes before data and equipment in every response checklist.
- If a question stresses a tight budget and long acceptable downtime, think cold site; near-zero downtime means hot site or mirroring.
Common traps
- BCP vs DRP: BCP keeps the business operating; DRP restores technology and facilities.
- Fault tolerance vs high availability: fault tolerance avoids interruption; HA recovers quickly after a short one.
- RAID vs backup: RAID survives disk failure, not deletion, corruption or site loss.
- Incremental vs differential: incremental clears the archive bit (many restores, quick backups); differential doesn’t (two restores, slower backups).
- Warm vs hot: a warm site has equipment but no current data.
- Parallel vs full interruption: parallel tests leave the primary site running.
- Read-through vs tabletop: read-through is individual document review; tabletop is a group scenario discussion.
- Recovery vs restoration: recovery gets operations working at the alternate site; restoration (the salvage team’s job) fixes the primary facility.
- Mutual assistance agreements: cheap, but the exam usually wants their weaknesses (enforceability, shared disaster risk, confidentiality).
Quick revision
- Disasters are natural or human-made; include utilities, connectivity, supply chain, labour and theft.
- Remove SPOFs; know fault tolerance, HA and resilience; 99.999% is about 26 seconds a month.
- RAID 0 none, 1 mirror, 5 single parity, 6 double parity, 10 stripe of mirrors. RAID isn’t backup.
- UPS for minutes, generators for days with fuel contracts.
- Trusted recovery: fail secure or open by design; manual, automated, without undue loss, function.
- QoS: bandwidth, latency, jitter, packet loss, interference.
- Sites: cold (cheap, slow), warm (gear, no data), hot (ready, expensive), mobile, cloud, multiple.
- Databases: vaulting (bulk), journaling (logs), mirroring (live).
- Backups: full, incremental, differential; offsite copies; test restores; software escrow.
- DR process: response, personnel, communications, assessment, restoration, training, lessons learned.
- Tests: read-through, tabletop, walkthrough, simulation, parallel, full interruption.
Key terms
| Term | Meaning |
|---|---|
| Disaster recovery plan | The technical and procedural plan for restoring IT services and facilities after a disruption |
| Single point of failure | A component whose failure stops the whole system |
| Fault tolerance | The ability to keep operating when a component fails |
| Failover cluster | Servers configured so another node takes over automatically if one fails |
| Trusted recovery | Recovery that returns a system to operation without weakening its security |
| Jitter | Variation in packet delay across a network |
| Hot site | A fully equipped alternate site with current data, ready almost immediately |
| No-lockout clause | A contract term guaranteeing access to a shared recovery facility during high demand |
| Resource capacity agreement | A commitment from a provider to supply the resources needed during recovery |
| Mutual assistance agreement | A pledge between organisations to share facilities in a disaster |
| Electronic vaulting | Bulk transfer of backup files to an offsite location |
| Remote journaling | Frequent transfer of database transaction logs to a remote site |
| Remote mirroring | Real-time replication of database changes to a live remote server |
| Archive bit | A file attribute that backup software uses to track which files have changed |
| Software escrow | Third-party custody of source code, released to the customer if agreed trigger events occur |
| Salvage team | The team that restores the primary site while operations run elsewhere |
| Full interruption test | A test that shuts down the primary site and runs on the recovery site |